⚡ Electrical Work Quotation Generator

Integrated Supply & Erection Analysis Matrix System

⚙️ Global Factor Multipliers (Default Settings %)

➕ Complete BOQ Pricing Entry Interface

📦 Supply Specification Parameters

Supply Options Surcharges (% on Discounted Unit Price)

🛠️ Erection & Installation Tasks Cost Inputs

Labor & Operational Tasks Unit Rates (Per Meter / Per Nos)

📊 Live Complete Quotation Calculation Matrix

S.N. Description Qty (Mtr/Nos) List Rate Disc % Supply Cost Total Erection Cost Total Combined Total Action Controls

📈 Complete Summary Dashboard

All Things Grand Total = ₹0.00
All Things Supply Profit = ₹0.00
All Things Erec. Profit = ₹0.00

📦 Supply Cost Accumulation Breakdown

All Items Purchase Cost = ₹0.00
Accessories =₹0.00
Freight =₹0.00
Insurance =₹0.00
PRICE ESCALATION =₹0.00
Site Expenses =₹0.00
Design Charges =₹0.00
Bank Charges =₹0.00

🛠️ Erection & Labor Cost Accumulation Dashboard

Total Quantity (Meter/Nos) Accumulated = 0.00
Basic Erection =₹0.00
Overhead / Floors =₹0.00
Chase Work =₹0.00
Digging =₹0.00
Backfilling =₹0.00
Safety =₹0.00
Other Installation =₹0.00
Wiring / Cabling =₹0.00
Hanging Work =₹0.00
Accessories Installation =₹0.00
Box / DB Fixing =₹0.00
MCB Installation =₹0.00
Testing / Commissioning =₹0.00
Commissioning =₹0.00
Extra Work =₹0.00
Timing & Documentation =₹0.00
Terminations =₹0.00
Other 1 =₹0.00
Other 2 =₹0.00
Other 3 =₹0.00
Other 4 =₹0.00
Other 5 =₹0.00
Other 6 =₹0.00
Other 7 =₹0.00