SITC & ITC ENGINEERING ESTIMATOR

PR MEP SERVICES

Multi-Trade MEP Rate Analysis (Material + Labor Breakdown) & BOQ Generator

1. Project Details & Global Rate Parameters

Auto-saved

PF, ESIC, Bonus, LWF
Site Engineer / Safety
Off-cuts, Pipe/Wire Scrap
Transport to Site Store
Access / Delay Buffer
Net Profit & Overhead
Applied on Subtotal

2. Single-Item Rate Analysis Breakdown (Material + Labor)

Inspecting: Item 1.1.1
Rate Analysis Component Calculation Basis Rate / Unit (₹) Share

3. Multi-Trade MEP BOQ Quotation Sheet

Item No. Trade Description of Work Unit Qty Base Mat. (₹) Tech Help Out/Day Tools (₹) Logis. (₹) Mat. Rate Labor Rate Unit Rate (₹) Total Amount Actions
Commercial Note (SITC Mode): Rates include Supply of approved make materials (with wastage & site freight), Installation, Testing, and Commissioning. Scaffolding above 3.5m and civil structural cut-outs excluded unless stated.
Total Material Component: ₹0.00
Total Labor & Execution: ₹0.00
Subtotal (Excl. GST): ₹0.00
GST (18%): ₹0.00
Grand Total (Incl. GST): ₹0.00