🎛️ Multi-Discipline Engineering Converter
🌡️ 1. Mechanical & HVAC Engineering Units
| Unit Name | Symbol | Core Engineering Description | Standard Engineering Equations / Baseline Reference |
|---|---|---|---|
| Tons of Refrigeration | TR | Measures total thermal cooling equipment load or capacity bounds. | 1 TR = 12,000 BTU/hr = 3.517 kW_th |
| Cubic Feet/Minute | CFM | Imperial unit tracking volumetric air flow rates inside mechanical duct paths. | CFM = Area (Sq. Ft) × Velocity (FPM) |
| Cubic Meters/Hour | CMH | Metric SI equivalent measurement tracking air volumes inside fan components. | 1 CFM = 1.699 CMH | CMH = m³/hr |
| External Static Pressure | Pa / in. wg. | Measures frictional pipeline drag losses air blowers must actively overcome. | 1 in. wg. = 249.1 Pascals (Pa) |
| Decibels / A-weighted | dB / dBA | Quantifies localized sound pressure levels to safeguard acoustic parameters. | dBA matches human hearing noise responses |
⚡ 2. Electrical Power Infrastructure Units
| Unit Name | Symbol | Core Engineering Description | Standard Engineering Equations / Baseline Reference |
|---|---|---|---|
| Kilovolt / Volt | kV / V | Measures potential electro-motive force across wiring loops. | V = Current (I) × Resistance (R) |
| Ampere | A | Measures continuous rate of electrical current electron flow paths. | Used to gauge breaker sizing parameters |
| Kilowatt (Active Power) | kW | Measures true working power executing actual work output inside a load. | kW = (V × I × PF × √3) / 1000 (3-Phase) |
| Kilo-Volt-Ampere | kVA | Measures apparent power total capacity delivered by generators/transformers. | kVA = (V × I × √3) / 1000 | kVA = kW / PF |
| Power Factor | PF / cos φ | The efficiency index variable mapping real power against apparent tracking. | PF = kW / kVA (Value bounds scale 0.0 to 1.0) |
💧 3. Public Health, Plumbing, & Fire Hydraulics
| Unit Name | Symbol | Core Engineering Description | Standard Engineering Equations / Baseline Reference |
|---|---|---|---|
| Gallons Per Minute | GPM | Imperial fluid velocity tracking pump and fire hydrant delivery capacities. | 1 GPM = 0.063 Liters/Second (LPS) |
| Pounds per Sq. Inch | PSI / Bar | Measures internal loop hydrostatic tracking pressures inside containment networks. | 1 Bar = 14.5038 PSI = 100,000 Pa |
| Meters of Head | m head | Measures static geometric lifting height capacity required by pump boosters. | 1 m head = 0.1 Bar pressure vertical pull |
| Drainage Fixture Unit | DFU / WSFU | Load factors calculating pipe sizing via maximum intermittent usage curves. | Computed via Hunter's load probability indexes |