PR MEPS Map

MEP Contractor ISO 9001:2015


And ISO 14001:2015

image image2

Electrical Contractor in Gurgaon, HT Electrical Contractor in Gurgaon, LT Electrical Contractor in Gurgaon.

Internal or External HT and LT Electrical Contractor in Gurgaon with Supply/ Labor Rate.

External HT Electrical Contractor in Gurgaon with Supply/ Labor Rate.

PR MEP is a trusted Electrical Contractor in Gurgaon for External HT Electrical Work projects with supply and labor rate services. We provide complete HT electrical installation, cable laying, termination, panel installation, and maintenance services for commercial and industrial projects in Gurgaon.

Internal HT Electrical Contractor in Gurgaon with Supply/ Labor Rate.

PR MEP offers professional Internal HT electrical work services as a leading Electrical Contractor in Gurgaon. We handle HT electrical installations, internal cable termination, electrical panels, and complete HT project execution with supply and labor contracts.

External LT Electrical Contractor in Gurgaon with Supply/ Labor Rate.

We are an experienced Electrical Contractor in Gurgaon providing External LT electrical work services for commercial, residential, and industrial projects. Our services include LT cable laying, electrical panel installation, street lighting, and complete LT electrical project work.

Internal LT Electrical Contractor in Gurgaon with Supply/ Labor Rate.

PR MEP provides Internal LT electrical solutions as a trusted Electrical Contractor in Gurgaon. We specialize in LT electrical installations, maintenance, cable termination, and complete internal electrical project execution on supply and labor rates.

Electrical Contractor in Gurgaon, HT Electrical Contractor in Gurgaon, LT Electrical Contractor in Gurgaon, Internal HT Electrical Contractor in Gurgaon, External HT Electrical Contractor in Gurgaon, Internal LT Electrical Contractor in Gurgaon, External LT Electrical Contractor in Gurgaon, HT and LT Electrical Work Contractor in Gurgaon.

"PR MEPS" provides a complete range of Internal and External HT & LT electrical works including design, supply, installation, testing, commissioning, and maintenance services. As a leading Electrical Contractor in Gurgaon, we serve commercial, industrial, and residential projects with professional electrical solutions.

PR MEP Electrical Service Specialization Works

PR MEP is a professional Electrical Contractor in Gurgaon specializing in electrical panel fabrication, busbar installation, HT/LT cable laying, cable termination, pole light installation, high mast lighting, and complete electrical infrastructure projects. We provide expert HT and LT electrical services for industrial, commercial, and residential projects across Gurgaon.

  • • Electrical Engineering ( Design & Product Selection).
  • • Approve HT Connection by Government, Approved Site Plan, Board Resolution.
  • • Power Transformers, LT Transformers.
  • • Supply and Installations of Electrical Panel Systems like RMU, VCB, ACB, MBDB, MDBs, Panels, SMDBs, DBs / Capacitor Banks.
  • • BMS Installation.
  • • Busbar System Installation.
  • • Cable Laying & Termination Works.
  • • Electrical Containment Systems.
  • • Low Current System & Low Voltage System.
  • • Power Distribution.
  • • Building Maintenance Systems.


We work with you from start to finish of your project, including:
•Site Survey    •Estimation    •Design    •Installation    •Commissioning    •Maintenance


External HT Project Work with Supply:

  • Power House to Your Building HT Meter- HT Line
  • HT Meter- Approvel

  • Internal HT Project Work with Supply:

  • HT Meter to VCB/ RMU
  • VCB/ RMU to RMU's/ VCB/ Transformer.
  • VCB/ ACB/ Transformer.
  • External LT Project Work with Supply:

  • Transformer to ACB/ VCB
  • DG
  • Sync Panel
  • Main LT Panel
  • Busbars
  • LT Cabling
  • Capacitor Panels
  • Distribution Panels
  • Riser Main Busbar
  • LT Meter Panels
  • Feeder Panel
  • Pole Lights
  • Heigh Mast Pole Lights
  • Control Lights
  • Hume Pipe
  • HDPE Pipe
  • Road Crossing
  • Chambers
  • Internal LT Project Work with Supply:

  • Meter Panel to DB's
  • DB to Equipments.
  • Common Area Lighting.

  • Professional & Specialized MEP Contractor in Gurgaon, Delhi NCR

    Contact us